久久婷婷国产|欧美成人精品二区三区99精品 |久久久久久久久久99精品|夫の137上司人妻中文字幕

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links

久久婷婷国产|欧美成人精品二区三区99精品 |久久久久久久久久99精品|夫の137上司人妻中文字幕

久久国产成人精品国产成人亚洲| 日日韩av| 日本熟女乱| 飘雪影视在线免费观看电影| 91丨国产丨熟女大屁股| 日韩欧美一区二区三区在线| 成人高潮片视频v999av| 国产精品一区二区三麻豆| 国产精品亚洲一区二区在线观看| 国产精品麻豆果冻传媒下载 | 飘雪电影在线手机免费观看| 成人国产精品免费观看视频| 日韩一区二区三区免费播放| 日本xxxx少妇| 亚洲一区二区三区乱码| 久久精品亚洲综合专区| 蜜臀av一区二区三区人妻在线| 欧美日韩国产在线一区| 少妇与公做了夜伦理| 亚洲欧美中文日韩在线| 国产精品精品视频一区二区三区| 少妇人妻偷人精品免费图片 | 久久精品成人91一区二区| 日韩精品免费在线播放| 国产成人精品a视频一区www| av蜜桃网| 91精品国产综合久久小美女| 弄得少妇高潮一区二区网站| 精品av中文字幕在线毛片| 蜜桃成人av| 国产精品99久久久久久精品玩具| 国产一精品一aⅴ一免费| 欧美日韩亚洲三区| 亚州av影视| 99国产精品久久| 久久久久中文字幕亚洲精品| 国产午夜福利av| 99精品毛片| 强伦人妻一区二区三区视频| 99国产揄拍国产精品人妻蜜| 美女被无套内射|